Aurora Colorado Fence and Solar Permit Guide
Aurora fence work must follow construction, design, location, and setback standards, while solar projects use dedicated permit checklists and inspection resources.
Fence and Solar Permits
Aurora, Colorado
April 26, 2026
Permit takeaway
Aurora neighborhood zoning guidance says a fence permit is not required for new or replacement fences, while solar applicants should use solar photovoltaic permit checklists and inspection resources.
Zoning and placement
Fence placement, solar equipment placement, zoning restrictions, property lines, and utility-locate requirements should be checked before work starts.
Building and trade review
Aurora permits solar and wind systems in all zone districts subject to underlying zone restrictions, and solar permits may be submitted electronically through Aurora4Biz.
Call before applying when
Call before installing a fence near property lines, utilities, easements, corners, or drainage areas, or before applying for solar with batteries, structural roof questions, or nonstandard equipment.
Documents to prepare
- Fence location and height
- Solar PV permit checklist
- Equipment specifications
- Electrical and roof or site information
Inspection planning
- Confirm fence standards before installation
- Contact Colorado 811 before digging
- Submit solar permit materials
- Schedule solar inspection
Official sources
This guide is a planning summary. Always verify the current requirements with the local office before starting work.