Billings Montana Deck, Shed, and Solar Permit Guide
Billings provides residential forms and guides for decks, sheds, garages, egress windows, re-roofing, homeowner electrical acknowledgement, and solar photovoltaic plan requirements.
Deck, Shed, and Solar Permits
Billings, Montana
April 26, 2026
Permit takeaway
Billings lists decks among work requiring a building permit, while detached sheds not exceeding 200 square feet are listed among work that does not require a building permit.
Zoning and placement
Detached sheds and deck locations should still be checked for setbacks, lot coverage, easements, and zoning limits even when a small shed is exempt from building permit review.
Building and trade review
The city publishes residential resources for deck handbooks, shed forms, garages, egress windows, re-roofing, and solar photovoltaic system plan requirements.
Call before applying when
Call before applying if the deck is attached or elevated, the shed is near 200 square feet, solar is being installed, or electrical work may need a separate permit.
Documents to prepare
- Residential form or guide
- Deck handbook information
- Shed size and site plan
- Solar PV plan requirements
- Homeowner electrical acknowledgement if applicable
Inspection planning
- Select the residential guide
- Submit required plans
- Coordinate electrical or solar details
- Schedule required inspections
- Keep final approval records
Official sources
This guide is a planning summary. Always verify the current requirements with the local office before starting work.