Birmingham, Alabama

Birmingham Alabama Driveway and Sidewalk Permit Guide

Birmingham driveway and sidewalk work can require Transportation Department review when access changes, substantial improvements, or work in the public right-of-way are involved.

Project

Driveway, Sidewalk, and Right-of-Way Permits

Location

Birmingham, Alabama

Last reviewed

April 26, 2026

Permit takeaway

Birmingham's transportation design policy says a Sidewalk and Driveway Permit must be obtained through BDOT when a property undergoes substantial improvement or proposed access changes are made.

Zoning and placement

Driveway changes should be checked against city transportation standards, access policies, sidewalk conditions, and any public right-of-way impacts.

Building and trade review

BDOT recommends speaking with a department representative before plan development to determine what will be required and allowed for driveways and streetside work.

Call before applying when

Call before applying if a driveway will be added, widened, relocated, tied to substantial improvement, or if sidewalk, curb, street, or right-of-way work is involved.

Documents to prepare

Inspection planning

Official sources

This guide is a planning summary. Always verify the current requirements with the local office before starting work.