Bloomington, Minnesota

Bloomington Minnesota Solar Photovoltaic Permit Guide

Bloomington solar photovoltaic projects start with zoning checks for height, setbacks, and conditional-use triggers before permit applications and inspections.

Project

Solar Permits

Location

Bloomington, Minnesota

Last reviewed

April 26, 2026

Permit takeaway

Bloomington's solar checklist instructs applicants to determine whether the installation meets zoning requirements before applying for solar photovoltaic permits.

Zoning and placement

Roof-mounted and ground-mounted solar must meet height limits, and systems extending more than 15 feet above roof level or ground level may require a Conditional Use Permit.

Building and trade review

Applicants should confirm zoning requirements with the Planning Division before submitting building and electrical permit materials for solar PV work.

Call before applying when

Call before applying if solar panels are ground-mounted, extend more than 15 feet above roof or grade, need a service upgrade, include battery storage, or may affect setbacks.

Documents to prepare

Inspection planning

Official sources

This guide is a planning summary. Always verify the current requirements with the local office before starting work.