Cambridge Deck, Roof, Solar, and Trade Permit Guide
Cambridge publishes building, roof, siding, solar, electrical, plumbing, gas, and mechanical permit paths, plus FAQ guidance for deck guardrails, roof layers, and sheds.
Deck, Roof, Solar, and Trade Permits
Cambridge, Massachusetts
April 26, 2026
Permit takeaway
Cambridge building permit applications include new construction, addition or alteration, roof, siding, solar, and other categories, while electrical, plumbing, and gas permits use separate permit paths.
Zoning and placement
Decks, roof decks, windows, doors, skylights, exterior stairs, and covered porch enclosures can require plot plans, dimensional plans, elevations, zoning documentation, and historic review.
Building and trade review
Cambridge FAQ notes that decks more than 30 inches above grade need guardrails and that only one layer of roofing may remain when re-roofing.
Call before applying when
Call before applying if the project includes a deck, roof deck, roof replacement, solar, siding, electric, plumbing, gas, HVAC, shed over 120 square feet, or exterior changes on a protected structure.
Documents to prepare
- Correct permit application type
- Plans and elevations if required
- Plot plan if required
- Equipment or trade details
Inspection planning
- Submit online permit
- Coordinate building and trade inspections
- Do not advance work until required utility signoffs are complete
- Keep permit card onsite
Official sources
- Cambridge Building Permit Applications
- Cambridge Building, Electric, Plumbing Permits
- Cambridge Frequently Asked Questions
This guide is a planning summary. Always verify the current requirements with the local office before starting work.