Cambridge, Massachusetts

Cambridge Deck, Roof, Solar, and Trade Permit Guide

Cambridge publishes building, roof, siding, solar, electrical, plumbing, gas, and mechanical permit paths, plus FAQ guidance for deck guardrails, roof layers, and sheds.

Project

Deck, Roof, Solar, and Trade Permits

Location

Cambridge, Massachusetts

Last reviewed

April 26, 2026

Permit takeaway

Cambridge building permit applications include new construction, addition or alteration, roof, siding, solar, and other categories, while electrical, plumbing, and gas permits use separate permit paths.

Zoning and placement

Decks, roof decks, windows, doors, skylights, exterior stairs, and covered porch enclosures can require plot plans, dimensional plans, elevations, zoning documentation, and historic review.

Building and trade review

Cambridge FAQ notes that decks more than 30 inches above grade need guardrails and that only one layer of roofing may remain when re-roofing.

Call before applying when

Call before applying if the project includes a deck, roof deck, roof replacement, solar, siding, electric, plumbing, gas, HVAC, shed over 120 square feet, or exterior changes on a protected structure.

Documents to prepare

Inspection planning

Official sources

This guide is a planning summary. Always verify the current requirements with the local office before starting work.