Casper Wyoming Building and Trade Inspection Guide
Casper inspections are required before work is covered, including building, electrical, mechanical, and plumbing rough-in and final inspection stages.
Building and Trade Inspections
Casper, Wyoming
April 26, 2026
Permit takeaway
Casper states that all construction requires inspections before it is covered up.
Zoning and placement
Inspection planning should match the approved scope, plot plan, and permit conditions so work is not covered before required review.
Building and trade review
Building inspections can include rebar, footing and foundations, under-floor or slab, rough frame, insulation, drywall, final, or certificate of occupancy inspections.
Call before applying when
Call before covering footing, framing, insulation, drywall, electrical, mechanical, plumbing, gas, water, sewer, or slab work.
Documents to prepare
- Permit number
- Approved plans
- Inspection type
- Site access instructions
- Trade permit details
Inspection planning
- Schedule inspection before covering work
- Coordinate building and trade inspections
- Complete rough-in inspections
- Resolve corrections
- Request final or certificate of occupancy inspection
Official sources
This guide is a planning summary. Always verify the current requirements with the local office before starting work.