Charleston Solar, Roof, Generator, and Trade Inspection Guide
Charleston lists online permit paths for solar panels, roofing, fuel gas, plumbing, and other trade permits, with inspections scheduled through the Customer Self Service portal.
Solar, Roof, and Trade Permits
Charleston, South Carolina
April 26, 2026
Permit takeaway
Charleston's permit center lists solar panel, roofing, fuel gas, plumbing, demolition, and other permit types among online submittals, while the applications page lists solar panels, roof repair or replacement, and generators under residential work.
Zoning and placement
Solar, roof, and generator work may be affected by historic review, flood conditions, exterior visibility, utility requirements, and site-specific placement.
Building and trade review
Charleston inspection procedures say sub-trade inspections tied to a building permit are scheduled under the building permit, while stand-alone trade inspections are scheduled within the trade permit.
Call before applying when
Call before applying if the project includes solar panels, generator fuel gas, roof replacement, flood-zone conditions, historic exterior work, or multiple trades under one building permit.
Documents to prepare
- Permit application
- Equipment specifications
- Roof or mounting information
- Fuel gas, plumbing, or electrical details
- Field-copy plans
Inspection planning
- Submit through CSS when available
- Post address and permit placard
- Keep field-copy plans onsite
- Schedule trade inspections under the correct permit
- Complete final inspection
Official sources
This guide is a planning summary. Always verify the current requirements with the local office before starting work.