Murfreesboro Townhome, Duplex, and Zero Lot Line Permit Guide
Murfreesboro townhomes, duplexes, and zero-lot-line residential projects need plan review, unit-separation details, and building permits coordinated through the city's plan submission process.
Townhome, Duplex, and Zero Lot Line Permits
Murfreesboro, Tennessee
April 26, 2026
Permit takeaway
Murfreesboro requires site plans, building plans, and plan review applications for townhomes, duplexes, zero lot lines, and each building or unit type as applicable.
Zoning and placement
Townhomes and similar attached units must comply with current adopted residential building code and local planning requirements before permits are issued.
Building and trade review
Plans must include details and sections of the unit separation wall, and individual building permits are issued for each building.
Call before applying when
Call before applying if the project is a townhome group, duplex, zero-lot-line project, phased building, or if certificate of occupancy timing differs between units.
Documents to prepare
- Site plans
- Building plans
- Plan review application
- Unit separation wall details
- School facilities tax receipt when required
Inspection planning
- Submit plans electronically
- Complete plan review
- Obtain permits for each building
- Coordinate inspections
- Request certificate of occupancy at the proper stage
Official sources
This guide is a planning summary. Always verify the current requirements with the local office before starting work.