Reno Solar and EV Charger Permit Guide
Reno allows solar and EV charger permits to be applied for through the regional online permitting portal.
Solar and EV Permits
Reno, Nevada
April 26, 2026
Permit takeaway
Reno says applicants may apply for solar and EV charger permits directly through the ONE Regional Licensing and Permitting site.
Zoning and placement
Solar and EV charger projects can involve equipment placement, electrical load, roof conditions, and site-plan questions.
Building and trade review
Reno provides an electrical load calculator and solar/EV permit access through its building permit resources.
Call before applying when
Call before applying if the project includes a panel upgrade, roof structural questions, battery storage, exterior equipment, or trenching.
Documents to prepare
- Solar or EV permit application
- Electrical load information
- Equipment specifications
- Roof or site plan when required
Inspection planning
- Track application status online
- Schedule electrical or building inspections
- Keep approved documents available
- Complete final approval
Official sources
This guide is a planning summary. Always verify the current requirements with the local office before starting work.