San Diego EV Charger Permit Guide
San Diego publishes an EV charging systems bulletin that describes permits, submittals, and inspections.
EV Charger Permit
San Diego, California
April 26, 2026
Permit takeaway
San Diego says an electrical permit is required for installation of an electric vehicle charging system.
Zoning and placement
Historical requirements, municipal code, land development code, and site conditions can affect EV charger placement.
Building and trade review
A building permit can apply when new construction, additions, or alterations to an existing structure are proposed.
Call before applying when
Call before applying if the charger includes structural work, trenching, multifamily/common parking, a panel upgrade, or historic-property conditions.
Documents to prepare
- EVSE specifications
- Electrical load details
- Site plan if requested
- Panel and circuit information
Inspection planning
- Electrical inspection
- Building inspection if structural work is included
- Final inspection
Official sources
This guide is a planning summary. Always verify the current requirements with the local office before starting work.