San Diego, California

San Diego EV Charger Permit Guide

San Diego publishes an EV charging systems bulletin that describes permits, submittals, and inspections.

Project

EV Charger Permit

Location

San Diego, California

Last reviewed

April 26, 2026

Permit takeaway

San Diego says an electrical permit is required for installation of an electric vehicle charging system.

Zoning and placement

Historical requirements, municipal code, land development code, and site conditions can affect EV charger placement.

Building and trade review

A building permit can apply when new construction, additions, or alterations to an existing structure are proposed.

Call before applying when

Call before applying if the charger includes structural work, trenching, multifamily/common parking, a panel upgrade, or historic-property conditions.

Documents to prepare

Inspection planning

Official sources

This guide is a planning summary. Always verify the current requirements with the local office before starting work.