San Francisco ADU Building Permit Guide
San Francisco ADU projects require building permits and can involve multiple units, seismic work, variances, certificates of appropriateness, and higher-cost review.
ADU Permit
San Francisco, California
April 26, 2026
Permit takeaway
San Francisco says a building permit is required to do construction for an accessory dwelling unit.
Zoning and placement
ADU projects can take longer when they include multiple ADUs, seismic work, variances, or a Certificate of Appropriateness.
Building and trade review
Project plans, property conditions, and scope determine which process applies before a building permit can be issued.
Call before applying when
Call before applying if the ADU changes occupancy, adds units, includes seismic work, affects a historic property, needs a variance, or changes utilities.
Documents to prepare
- ADU building permit application
- Project plans
- Property and unit information
- Seismic, variance, or historic documents if applicable
Inspection planning
- Follow the ADU permit process
- Respond to agency review
- Schedule building and trade inspections
- Keep final approval records
Official sources
This guide is a planning summary. Always verify the current requirements with the local office before starting work.