San Jose EV Charger Permit Guide
San Jose publishes residential EV charging rules for Level 1 and Level 2 chargers.
EV Charger Permit
San Jose, California
April 26, 2026
Permit takeaway
San Jose says Level 1 charging from an existing standard outlet does not require a permit, but installing a new 120V outlet requires an electrical permit.
Zoning and placement
Residential properties may use Level 1 or Level 2 charging stations; Level 3 chargers are not allowed on residential properties.
Building and trade review
Level 2 charging, new outlets, panel work, and other electrical changes should be treated as electrical permit work.
Call before applying when
Call before applying if the charger needs a new circuit, panel upgrade, exterior equipment, trenching, or shared parking installation.
Documents to prepare
- EVSE specifications
- Panel and circuit information
- Load calculation if requested
- Site or parking layout if relevant
Inspection planning
- Electrical inspection
- Panel inspection if changed
- Final inspection
Official sources
This guide is a planning summary. Always verify the current requirements with the local office before starting work.